Use Preventive Maintenance to Stop Recurring Failures

 

Four fleet managers find four approaches to fend off failures.

 

It's no secret history repeats itself, but that doesn't have to be the case when it comes to equipment downtime. One sure way to put a stop to recurring failures before they become catastrophic is by compiling and using the accumulative data found in preventive maintenance (PM) histories.

At Cajun Equipment Services, President Michael Bates uses PM histories to protect his 145-unit fleet by preventing failures through high-quality maintenance practices, protecting the resale value of those assets, and avoiding premature equipment failure.

"We look for recurring failures or leading indicators of major failures so we can schedule the machine out of service rather than waiting for the machine to schedule itself out of service," he says.

According to Bates, the key to preventing premature equipment failure is the shop technician.

"A lot of companies use oil and other fluid analysis," he says. "We don't, unless it's required to maintain the OEM warranty. We rely on the technician to spot leading indicators visually, indicators such as the condition of the fluid. Technicians look for water and dirt contamination, metal, and discoloration. If any one indicator throws up a red flag, we go to the next level to find out what the specific contaminant is and how it got there. Is it a seal failure? Do we have someone in the field putting contaminated fluids in the machine? Is there equipment with a fluid leak at a jobsite that is being topped off incorrectly?"

Because Bates only uses oil and other fluid analysis to maintain warranty, the company doesn't track or store that data.

"The lab keeps all our records," he says. "We take the oil sample and send it to the lab; the lab sends the results to our dealer to maintain the warranty. We don't track it.

"We have an advantage over some other companies in that, typically, no one touches our equipment but us and the dealer. In both cases, the technicians are skilled enough to recognize a leading indicator and take corrective action."

The basic principles of PM are the same throughout the fleet; although, there is a slight difference in how PM is done when it comes to machine type. For example, says Bates, PM for a wheel loader is going to be different from a crawler dozer.

"You have tracks to maintain on dozers or excavators that you don't have on a wheel loader, so PM will vary somewhat," he says. "But the principles of using a PM schedule to avoid catastrophic failure are the same."

Accumulating PM history data is just the first step.

"You can have a truck load of data, but if you don't interpret and apply your data, and make it part of your real-world PM program, it's useless," says Bates. "It's just another function that burns up time and energy. We keep historical data on our machines from cradle to grave, and we keep it by categories that include type of machine and type of failure."

Historical data allows the company to track the failures that can occur at specific intervals.

"That gives us a crystal ball," says Bates. "For example, we know that out of 25 wheel loaders that had the same number of hours on them last year, we had to replace two torque converters. Of course, you can always have an unexpected failure, but as a rule, the more data you retain over a longer period of time the better you can identify trends and manage the assets."

No time for failure

Chris Ryan, equipment vice president for Boh Bros. Construction, relies on engine oil analysis and emphasizes the importance of keeping fluids clean to ward off equipment failures.

"Failure analysis is after the fact," he says. "What we do is have regular inspections, daily reports from the operators, oil analysis, and service reports. It's the combination of these, not any one of them, that we rely on. We use each one to validate the others so we don't incur a failure. The operative word is failure. If a failure occurs, it's a failure within the system, not simply a failure of a component."

According to Ryan, the cleanliness of fluids can never be taken for granted.

"We try our best to keep all fluids clean: fuel, hydraulic oil and engine oil," he says. "We have service trucks with reels on them, and we have reels in our shop to make certain the product is delivered in good condition. One manufacturer of paving equipment requires you to put hydraulic oil into a separate tank, and hand-pump it through a filter and into the reservoir. I think that speaks to the fact that even clean oil isn't necessarily clean enough."

For the 1,600 to 1,700 units in the Boh Bros. fleet, Ryan tracks and analyzes trends and performs stereograph analysis on engines and hydraulic systems.

"We also do particulate counts on hydraulic systems," he says. "Pressures and flows are done periodically. As you get wear on hydraulic pumps, they start to trend downward, and you can see it coming. You can schedule something like that for a component replacement."

Ryan says he's knows a lot of good people who swear by component replacement based on time in service, but he has found the operational variables are so great that he can't justify doing that for all equipment across the board.

The data Boh Bros. collects is organized in three categories. Category one is for safety issues that must be handled immediately: The machine is shut down. Category two is for a failure that could lead to other failures: The machine continues to operate, but is monitored. Category three is cosmetic.

"Cracked glass, a dented panel, or anything that's not going to interfere with the function or safety of a machine is cosmetic," says Ryan. "We put the machine in line for attention, but often we wait until the next time it comes in to the shop to do the repairs."

Machine type, application and other variables are used to determine maintenance schedules.

"Lifting and over-the-road equipment maintenance is compelled by law," he says. "Certain things, such as brake adjustments, tire treads on trucks, and oil leaks, have to be taken care of or the unit will be put out of service. On average, our rolling stock is brought through the shop every 60 days for service inspections and corrective action. Our cranes are inspected daily by the operator; an inspection by the equipment department is made at least every 60 days for functional and safety issues, such as hoist cables, load lines and booms."

For basic dirt equipment, Ryan relies on daily service and inspection by the operator, and periodic service by the company's service trucks.

First line of defense

Ron Hutchinson, CEM, at Barrett Paving Materials, is responsible for a fleet of 200 units. Oil analysis is the bedrock of his PM program and the first line of defense against equipment downtime.

"Every time we change the oil in a machine, we take a sample," says Hutchinson. "A lot of times, we sample oil even if the equipment is not due for service. We'll get a reading and then sample again at the 250-hour service check to monitor oil life."

If any repeat failures show up, Hutchinson takes a closer look to try to determine if the failure is due to operator errors, application-related issues or equipment problems, or whether a better machine might be needed to prevent that particular type of failure.

But, says Hutchinson, oil analysis is just the start.

"The more data you have, the better data you have," he says. "With a paver, for instance, you need two or three years of data to know how many tons of mix went through the machine and what type of mix was used. Then you can see what wear factor is caused by what type and tons of material placed."

Hutchinson says record keeping, regardless of how it's done, is essential.

"You have to keep your records all in one place and not have them scattered around in different files," he says. "I keep all the data on my computer so I can monitor it."

Also, he says, you need a mechanism to spot minor repairs. Daily check lists should have a place for "required repairs."

"The key is communication," he says. "You have to make sure the shop is notified by someone in the field when a machine needs service. That will take care of small repairs while they are small instead of letting them go until a catastrophic failure happens."

Oil analysis and fuel management

Dale Warner, CEM, with CJ Miller, manages about a thousand pieces of equipment. Warner also uses PM histories to stop recurring failures.

Warner uses PM histories focused on two factors—oil analysis and fuel management.

"The one thing we don't do is think if one machine ran for 3,000 hours, another one will do the same before it blows up," he says. "You can't measure workload in hours. If everything were equal, maybe, but when a piece of equipment moves from one job to another, conditions and applications change. One time you can be working in rock; another time you're working in mud: In those two applications, the gallons of fuel used and the work load vary. Because of that, hours can't really predict failure. Everything depends on the history of a particular unit and its individual work load."

Warner bases PM scheduling on fuel consumption, and says, while the PM for trucks is a little different than dozers, the schedules are the same.

"One type of unit runs longer than the other," he says. "For example, we have articulated trucks running up to 700 hours on an oil change. Other trucks do 300 or 400 hours because of where they're hauling."

The fleet's oil analysis data is captured and stored by the laboratory that analyzes the oil samples.

"The data is accessible to us online whenever we need it," he says. "We can also get a hard copy from the lab if we want it."

Fuel management is handled internally, and Warner says the company is in the process of installing an automatic fuel-tracking system with about 80 percent of the fleet already converted.

"The system records when fuel was stored in the fuel truck and when it was put into a machine," he says.

When the fuel trucks return to the yard, a wireless system sends the information to the computer, which reports gallons of fuel used, hours operated, time, date, and job number.

"The Opak USA fuel tracking system we use has totally automated data retrieval," says Warner. "The equipment has a sender on it, and the fuel nozzle has the receiver. When the nozzle goes into the tank, all the data is recorded. We also use the system to measure equipment utilization."

To get the biggest bang from using PM histories to stop recurring failures have a system in place that allows the procedure to work.

"It all starts with people," says Warner. "You have to have people who really care about what they're doing and people who pay attention to what they're doing. You also have to use quality products and have the support from top management to get the job done."

All four fleet managers agree that while philosophies, techniques and technologies may differ when it comes to using PM histories to stop machine failures, success requires the absolute commitment of top management.

Sponsored Links

ACP Pubs - Maintenance News
Updated :

Warren Cat Makes Its Move
Warren Caterpillar in Tulsa has moved across town to their new facility at 3601 N. Garnett Road, a mile east of Tulsa International Airport. The new building is approximately 114,000 square feet in size and situated on 36 acres, near the intersection of North 169 and East 36th Street North. "Our current location was once on the outskirts of town," explained Jim Nelson, president of Warren CAT.
Publ.Date : Mon, 15 Sep 2008 00:00:00 PST

Deere Enhancing Parts Service Capabilities
Moline, IL— Deere & Co. says it will enhance its parts service capabilities in the U.S. and Canada by investing in capacity expansions at Deere's primary parts distribution center in Milan, IL, and three additional locations in the western U.S. and Canada. "This strategic investment will further enhance John Deere's leadership position," said Gail Leese, vice president of Worldwide Pa...
Publ.Date : Mon, 13 Oct 2008 00:00:00 PST

The Fuel Expert: 10 Ways to Cut Fuel Costs
Remember the good old days…about a year and a half ago? Prices at the pumps were hovering below four dollars per gallon and they ...
Publ.Date : Tue, 07 Oct 2008 00:00:00 PST

Efficiency Production Launches Repair Service
Efficiency Production, Inc., a manufacturer of trench shielding and shoring, has introduced its Trench Shield Repair & Recertification Service. The program aims to “repair and recertify” used or damaged trench shields by repairing the shield's damaged components and then recertifying the trench shield with new Occupational Safety & Health Administration (OSHA)-compliant prof...
Publ.Date : Mon, 29 Sep 2008 00:00:00 PST

Colson Adds Heavy Duty Polyurethane Triumph Wheels
Colson Caster’s new Triumph™ Wheel is suitable for major manufacturing environments including tow-line, automotive, and tire manufacturing sites. The new Triumph, with the MPH on the end standing for quick, smooth and silent rolling, is built for high capacity loads up to 1200 lbs per wheel.
Publ.Date : Tue, 26 Aug 2008 00:00:00 PST

Efficiency Production New Trench Shield Service
Efficiency Production, Inc. now offers a unique Trench Shield Repair & Recertification Service. The program aims to "repair & recertify" used or damaged trench shields by repairing the shield’s damaged components and then recertifying the shield with new OSHA compliant P.E. certified manufacturer’s tabulated data, including new depth ratings. This service will be available for other manufacturers’ trench shields, shoring, or support equipment like bedding boxes.
Publ.Date : Tue, 02 Sep 2008 00:00:00 PST

Fascan Provides TLC for Free
Fascan International has developed a new program to protect its customers from voiding their FASSI SE crane warranties through neglect or misuse. Effective this year, every FASSI SE crane comes with a multi-year warranty on parts and performance.
Publ.Date : Thu, 20 Nov 2008 00:00:00 PST

Arnco New Flatproofing Material
Arnco has introduced a new flatproofing fill material that uses renewable and environmentally based components and consumes 50 percent less petrochemicals in the production process. The new material features 100 percent virgin polymer that is not extended with granulated urethane fillers or rubber dust.
Publ.Date : Thu, 25 Sep 2008 00:00:00 PST

Meeting Emissions Requirements
Emissions requirements for construction equipment on the job site are becoming more common, and contractors who do not bring their equipment up-to-date will not be competitive and will not get contracts. Michigan CAT held a well-attended meeting on September 23 at its Novi, MI, facility to inform contractors about how they can keep their equipment in compliance with emissions requirements and r...
Publ.Date : Mon, 10 Nov 2008 00:00:00 PST

EPA Awards Wisconsin $295,320 Clean-Diesel Grant
The U.S. Environmental Protection Agency (EPA) Region 5’s Midwest Clean Diesel Initiative (MCDI) has awarded a $295,320 grant to for Wisconsin to use in its 2008 clean-diesel program. Illinois, Indiana, Michigan, Minnesota, and Ohio have also each received $295,320 under the program. Matching grants from these states total $1.
Publ.Date : Mon, 27 Oct 2008 00:00:00 PST

Automated Blog and Ping
RSS Software